|
|
Youth Development Center, Manchester, NH
North Branch Construction was awarded a $29.2 million contract for a construction project at the Youth Development Center in Manchester, NH as low bidder out of seven bidding contractors. With the original bid $2.6 million over budget, North Branch worked with the owner and architect providing value engineering to bring the project within budget. The project consists of a new 108,000 square foot architecturally secure detention facility, containing four residential clusters (each housing 36 residents), nine classrooms, space for an auto technology program, a building trades area, a kitchen and dining area, a library and other support areas. The project also includes the renovation of the existing recreation building and the existing administration building, as well as demolition of two buildings to be replaced by the new building. The new building was designed to resemble other buildings in the residential neighborhood, and includes pitched roofs, asphalt shingles and a brick veneer exterior. The project was designed by Lavallee/Brensinger, PA, of Manchester, NH. The campus remained occupied throughout the construction period. Sitework began in June 2004 and in late July, foundations were underway for the new facility. Phase I, completion of the southern access drive and fire lane, was completed in early September 2004 to give students access to the existing school buildings at the southern end of the campus. In November, steel erection was well underway with the masonry and roofing completed in the Spring 2005. Permanent power was in place by August 2005 and permanent heat was in place in September 2005. By late fall, the new construction was in the finish stage with painting, ceilings, tile and finish carpentry underway. Renovations of the recreation building including the pool, gym and chapel were completed in the early Spring of 2006. Each cluster and section of the facility is known by a letter designation. Building A is the Recreation Building which houses the indoor pool, gymnasium and former chapel (now a non-denominational multipurpose room). Buildings B, C, and D include Administration Offices, Classrooms, Buildings Support and Admissions. Buildings E, F, G and H are the Residential Buildings (clusters/pods). Each residential cluster is comprised of three levels. Each level has a secured block of 12 rooms (pod), which share a common living area, kitchenette, two bathrooms (complete with showers), and a counselor’s office (floor monitor). Each residential cluster is also supported with a supervisor’s office. The facility also provides several outdoor basketball courts between buildings. Resident rooms have masonry walls and epoxy flooring for easy maintenance and durability. Building C includes the only exterior entrance and exit for the building and houses the admissions office (complete with holding cell, shower and laundry), medical facililities (doctor, dentist and nursing) with exam rooms, patient rooms (for overnight stay), and the Industrial Arts (with complete carpentry workshop/classroom and Autoshop). There is a Culinary Arts area with complete commercial kitchen as well as a cafeteria and separate staff operated commercial kitchen. Each building is supported by generated power in case of power outages. The entire facility is architecturally secure with no exterior doors, windows which do not open and court yards which are surrounded by the buildings themselves or high security green fencing. The facility is a self-contained secured campus, nestled in this Manchester residential neighborhood. In February 2006, North Branch began turning the completed buildings over to the owner. Once the existing “cottages” have been vacated and staff and residents move into the new building, two of the existing buildings will be demolished to make way for a new driveway/access. Final sitework will be completed by summer’s end in 2006. The project has been Phased as follows:
On April 3, 2006, the new Youth Development Center was officially dedicated to John H. Sununu. Mr. Sununu, Governor of the State of New Hampshire from 1983-1989, ran an ambitious capital campaign which was instrumental in making this project a reality. The library within the facility was dedicated to the memory of Lionel Washington Johnson, who served 8 terms in the NH House of Representatives as an advocate for children, youth and civil rights. [ Institutional ] [ North Hampton Elementary ] [St. Paul's School's Armour Hall ] [St. Paul's School Quad Dormitories] [ Dartmouth College McCulloch Hall ] [ St. Paul's School Conover 20 & Middle Dormitories ] [ UNH Stillings Dining Hall ] [ John Stark Regional High School ] [ Kearsarge Regional High School ] |
|
North Branch Construction, Inc. 76 Old Turnpike Road, Concord, NH 03301 (603) 224-3233 - FAX (603) 225-7165 Our mission: To provide a level of value, quality and service unrivaled in the construction industry. North Branch Construction is a member of the U.S. Green Building Council, Associated Builders and Contractors, Inc.(NH/VT Chapter), NH Preservation Alliance, Granite State Chapter #218 of the National Association of Women in Construction, Greater Concord Chamber of Commerce and Plan NH.
|